On the 27th of February 2017, I went to the El ORR Castle Hotel to meet the manager and he said he was going to talk to the owner of the hotel about the projects we offer. He said the owner of the hotel has travelled and for that matter he was going to talk to him and he will get back to us. He said Mr. PP was his very good friend.
Here are some pictures i took.
GES-p4. GHANA SWISS Engineering (KUMASI POLYTEHNIC)
Monday, 27 March 2017
Saturday, 5 September 2015
EPLAN drawing
This is the drawing i did today for the eplan
https://drive.google.com/open?id=0B8cnflbD_jN_YmVFenJ5MnRxelk
Tuesday, 1 September 2015
trip to mampong
On the 31st of August, 2015, Mr. Sulley, Mr. Panford and I went to mampong to see Madam Gloria to take us to the land where the upcoming water drilling project was going to take place. We went there to survey the land for the project.
https://drive.google.com/open?id=0B8cnflbD_jN_flZ6V05FSk9QZ25MSW0yckhpUmRPMnRoZEJZdG1aTVRVOUtlMGwzbktCTlk
Subscribe to:
Comments (Atom)






